The rain finally stopped, and the building has begun. My wife and I took a ride over this morning to see if anything was being done to our house. Driving down the main street leading to the rest of the development we could see a wall in place on our neighbors house across the street. Seeing this, and a couple of workers over there, we assumed no work was being done in our lot. As we got closer we could see that, indeed something was happening in our lot. The pile of wood across the street was merely blocking our view. There were two guys working on putting wood and what looked like some sort of vapor barrier on the foundation. I'm not sure what you'd call this, but it seemed like some sort of baseplate prior to the floor joists going in.

I had to go to work, so I just got an update from my wife. It appears they got most of that baseplate down and lowered some wall sections into the basement. The house across from us has most of the first floor framed, so hopefully we'll be there soon. Can't wait!



4 comments:

  1. You are moving right along, Frank! How exciting!

    We are also watching the forecast... Supposed to rain here all next week. We are hoping it passes us!

    ReplyDelete
  2. The "baseplate" is call the sill plate, and there is a layer of foam insulation between the foundation wall and the sill plate to minimize air leakage. Watch how fast it moves along now, as long as the weather cooperates!

    ReplyDelete
    Replies
    1. Knew it was something like that. Thank you sister.